CAT D3C Front Idler Assembly 106-9187 Wholesales

Short Description:

Place of origin:China

Brand name:PT’ZM

Brand name:Caterpillar

Model number:D3C

Parts number:106-9187

Minimum order quantity: 1 PC

Supply Ability:100000 pcs /month

Price: Negotiate

Delivery time: 7-30 days

Payment term: L/C T/T

Price term: FOB/ CIF/ CFR

Application: Bulldozer & Crawler excavator

Custom-made or OEM is acceptable


Product Detail

Product Tags

What are the advantages of D3C front idler production process

Quality professional services in mining and construction operations, with industry-leading warranty period of 6 months to 2 years and perfect after-sales service system. Regular production technology advantages are as follows:

1.The wheel body of our product is made of 35SiMn with a hardness of HRC55-58 and the deepth reach 6-8mm , which is more wear-resistant. Central shaft material for 42Crmo steel is not easy to fracture. So that the service life of the product is longer.
The materials used in many products on the market are 50Mn and 45# steel, which can not meet the requirements of wear resistance and are easy to fracture.

2.Our technology uses forging and precision casting, CNC vertical machining production.
Precision casting makes the wheel body of high density, no pores and not easy to leak gas.
CNC vertical machine is used for more accurate control of product size and higher finish smoothness. And the equipment is better, the operation is safe, the production efficiency is higher,

3.The technical drawing of the product is 1:1 original size. This will not appear when the customer purchase size deviation can not be installed.

4.We have a professional QC team, and to follow up the product testing, semi-finished and finished product testing and produce reports.
All products have their own ID number. When customers feedback product problems, we will find the corresponding QC test declaration according to the ID number of the product, find the problem and come up with the solution

Caterpillar D3C bulldozer undercarriage parts number list

Description Part.No
Front idler 106-9187
6S3277
6Y1189
6Y1560
Track roller SF 238-7483
275-3579
281-8339
6S3607
Track roller DF 178-0615
231-3080
3T4353
6S3608
Carrier roller 6S3609
Sprocket Segment 9W9266
Sprocket segment group 275-3578
6Y2047
Track shoes assembly 37L 6Y2520
Track shoes 350mm 6S8815
6Y1328
Track chain assembly 37L
Pitch:155.6mm
154-3644
6Y1511

Detail information

Description: Front Idler Assembly Heavy duty Equipment
Place of origin: China
Brand name: PT'ZM
Brand name: Caterpillar
Model number D3C
Part number 106-9187
   
Price: Negotiate
Packaging details: Fumigate seaworthy packing
Delivery time: 7-30 days
Payment term: L/C T/T
Price term: FOB/ CIF/ CFR
Minimum order quantity: 1 PC
Supply Ability: 10000 pcs/month
   
Material: 35Simn/42Crmo
Technique: Forging/Precision casting
Finish: Smooth
Hardness: HRC55-58, deepth 6-8mm
   
Quality: mining operation heavy duty high-end quality
Warranty time: 24 monthes
After-sales service: Video technical support,Online support
Color: Black or Yellow or Customer required
Application: Bulldozer

Main technical parameter for Caterpillar D3C front idler

Model A B C D E F G
D3C 539 507 140 130 112 74 56
D3C IDLER DRAWING

Factory raw material

  • bottom roller material
  • bulldzoer idler material factories_
  • excavator  front idler manufacturers
  • suport roller ass
  • track link pin
  • track roller  material
  • front idler pin
  • track roller material
  • undercarriag parts idler  material

Factory workshop detail

  • undercarriage parts printing
  • track roller  test machine
  • track roller  machine
  • Track link chain machine
  • sprocket  machine
  • excavator undercarriage parts casting factories
  • excavator track link warehouse _
  • bulldozer undercarriage parts forge factories
  • bulldozer bottom roller warehouse

Packing method and shipping container details

  • dozer track roller packing method
  • bulldozer track roller  load in ship container
  • carrier roller loading in container
  • bulldozer track chain packing method
  • container load finish
  • excavator track link packing method
  • front idler  packing method
  • loading idler in container
  • top roller  packing method

  • Previous:
  • Next:

  • Write your message here and send it to us