D375 Track Roller Double Flange Assembly 195-30-00572

Short Description:

Place of origin:China

Brand name:PT’ZM

Brand name:Komatsu

Model number:D375

Parts number:195-30-00562

195-30-00572

195-30-01010

195-30-01051

195-30-01020

195-30-01061

195-30-01411

195-30-01421

Minimum order quantity: 1 PC

Supply Ability:10000 pcs /month

Price: Negotiate

Delivery time: 7-30 days

Payment term: L/C T/T

Price term: FOB/ CIF/ CFR

Application:  Bulldozer

Custom-made or OEM is acceptable

 


Product Detail

Product Tags

What are the D375 track roller advantages of PINGTAI production

The D375 series undercarriage parts are specially designed to extend service life and durability under the harshest operating conditions.Excellent after-sales service, industry leading warranty period of 6 months to 2 years. The more advantages of D375 track roller as following:

The material of D375 track roller body is forged by 40Mn2. and the surface heat treatment HRC 48-55 depth up to 5-8mm. Precision CNC machine machining size is more accurate

The material of the center shaft of the track roller forged by 42CrMo.The hardness of surface heat treatment can reach 48-55HRC More wear-resisting . Core hardness of HRC 28 or above is not easy to fracture. Tempering 180 degrees before finishing. The surface of the center shaft of the track roller is polished by CNC machine tool to make the shaft smoother.

High sealing aprons are used inside the track roller to prevent dirt, sand and water from damaging it.

The track roller using friction welding technology welding quality is good and stable, and environmental protection, no pollution. Welding process does not produce smoke or harmful gas, no splash, no lone light and spark, no radiation. Known as the green welding technology of the future.

 

What functions does D375 track roller have

The function of the track roller is to convey the weight of an bulldozer to the ground . When an bulldozer is run on uneven ground, track rollers carry a tremendous impact. Therefore, the support of track roller is huge. Moreover, if it is of poor quality and is often dusty, it needs a very good sealing to prevent dirt, sand and water from damaging it.

Detail information of D375 track roller

Description:

Track Roller DF Heavy Duty Equipment

Place of origin:

China

Brand name:

PT'ZM

Model number

D375

Brand:

Komatsu

Parts number:

195-30-00562

195-30-00572

195-30-01010

195-30-01051

195-30-01020

195-30-01061

195-30-01411

195-30-01421

Price:

Negotiate

Packaging details:

Fumigate seaworthy packing

Delivery time:

7-30 days

Payment term:

L/C T/T

Price term:

FOB/ CIF/ CFR

Minimum order quantity:

1 PC

Supply Ability:

10000 PCS/month

Material:

40Mn2/42Crmo

Technique:

Forging

Finish:

Smooth

Hardness:

HRC48-55, depth  5-8mm

Quality:

mining operation heavy duty

Warranty time:

24 months

After-sales service:

Video technical support, Online support

Color:

Yellow or Black or Customer required

Application:

Crawler bulldozer

Main technical parameter for Komatsu D375 track roller

D375

A

B

C

D

E

F

582

550

414

358

300

136

G

H

I

J

270

310

300

74.5

D375 TRACK ROLLER DRAWING

THE D375 SERIES CONSISTS OF

D375A-2, D375A-3, D375A-5, D375A-6

Factory raw material

  • bottom roller material
  • bulldzoer idler material factories_
  • excavator  front idler manufacturers
  • suport roller ass
  • track link pin
  • track roller  material
  • front idler pin
  • track roller material
  • undercarriag parts idler  material

Factory workshop detail

  • undercarriage parts printing
  • track roller  test machine
  • track roller  machine
  • Track link chain machine
  • sprocket  machine
  • excavator undercarriage parts casting factories
  • excavator track link warehouse _
  • bulldozer undercarriage parts forge factories
  • bulldozer bottom roller warehouse

Packing method and shipping container details

  • dozer track roller packing method
  • bulldozer track roller  load in ship container
  • carrier roller loading in container
  • bulldozer track chain packing method
  • container load finish
  • excavator track link packing method
  • front idler  packing method
  • loading idler in container
  • top roller  packing method

  • Previous:
  • Next:

  • Write your message here and send it to us