E330 Carrier Roller Manufacturers 6Y5323

Short Description:

Place of origin:China

Brand name:PT’ZM

Brand name:Caterpillar

Model number:E330

Parts number:6Y5323

Minimum order quantity: 1 PC

Supply Ability:10000 pcs /month

Price: Negotiate

Delivery time: 7-30 days

Payment term: L/C T/T

Price term: FOB/ CIF/ CFR

Application:  Excavator

Custom-made or OEM is acceptable


Product Detail

Product Tags

What are the production processes and advantages of carrier roller

PINGTAI factory produces undercarriage replacement parts and complete undercarriages for Caterpillar E330 series excavators. All of production with the warranty 6 months to 2 years. In addition to undercarriage parts, we also supply wear parts such as bucket , bucket teeth ,pin ,bushing and bolt nut etc... The production process of upper roller is as following :

The heat treatment depth is uniform hardening so that the supplier wear life equals the link wear life.

The material of the carrier roller body is forged by 40Mn2. and the surface heat treatment HRC 48-55 depth up to 5-8mm. Precision CNC machine machining size is more accurate

The center shaft of the carrier roller material is 42CrMo and forged .The hardness of surface heat treatment can reach 48-55HRC More wear-resisting . Core hardness of HRC 28 or above is not easy to fracture. Tempering 180 degrees before finishing. The surface of the center shaft of the carrier roller is polished by CNC machine tool to make the shaft smoother.

High sealing aprons are used inside the carrier roller to prevent dirt, sand and water from damaging it.

The carrier roller using friction welding technology welding quality is good and stable, and environmental protection, no pollution. Welding process does not produce smoke or harmful gas, no splash, no lone light and spark, no radiation. Known as the green welding technology of the future.

What is the function of the carrier roller

The carrier roller is above the track frame and its function is to raise the track so that it has a certain tension, and the chain is kept in a certain position and at a height high enough for debris to fall off the chain,  it can be kept relatively clean. The upper roller drives the sprocket in engagement with the track chain and moves the machine by pulling the chain over the sprocket.   Double flanged roller is suitable for 3 tons to 50 tons of excavators. If the roller fails, the track link will not work normally. It is very important to choose qualified high-end quality roller

Detail information

Description:

Carrier Roller Mining Operation Heavy duty

Place of origin:

China

Brand name:

PT'ZM

Brand name:

Caterpillar

Model number

E330

Part number

6Y5323

Price:

Negotiate

Packaging details:

Fumigate seaworthy packing

Delivery time:

7-30 days

Payment term:

L/C T/T

Price term:

FOB/ CIF/ CFR

Minimum order quantity:

1 PC

Supply Ability:

10000 PCS/month

Material:

40Mnb2/42Crmo

Technique:

Forging

Finish:

Smooth

Hardness:

HRC48-55, deepth 5-8mm

Quality:

mining operation heavy duty high-end quality

Warranty time:

24 months

After-sales service:

Video technical support,Online support

Color:

Black or Yellow or Customer required

Application:

Crawler Excavator

Main technical parameter for Caterpillar E330 carrier roller

E330

A

B

C

D

E

F

194

95

54

300

190

160

G

H

I

74

23

47

E330 CARRIER ROLLER DRAWING

THE E330 SERIES CONSISTS OF

330B 330B E330B L 330B LN 330C 330CL 330D

Factory raw material

  • bottom roller material
  • bulldzoer idler material factories_
  • excavator  front idler manufacturers
  • suport roller ass
  • track link pin
  • track roller  material
  • front idler pin
  • track roller material
  • undercarriag parts idler  material

Factory workshop detail

  • undercarriage parts printing
  • track roller  test machine
  • track roller  machine
  • Track link chain machine
  • sprocket  machine
  • excavator undercarriage parts casting factories
  • excavator track link warehouse _
  • bulldozer undercarriage parts forge factories
  • bulldozer bottom roller warehouse

Packing method and shipping container details

  • dozer track roller packing method
  • bulldozer track roller  load in ship container
  • carrier roller loading in container
  • bulldozer track chain packing method
  • container load finish
  • excavator track link packing method
  • front idler  packing method
  • loading idler in container
  • top roller  packing method

  • Previous:
  • Next:

  • Write your message here and send it to us