Hitachi EX300 Front Idler wholesales 9154690

Short Description:

Place of origin:China

Brand name:PT’ZM

Brand name:Hitachi

Model number:EX300-5

Parts number:915469

Minimum order quantity: 1 PC

Supply Ability:10000 pcs /month

Price: Negotiate

Delivery time: 7-30 days

Payment term: L/C T/T

Price term: FOB/ CIF/ CFR

Application:  Excavator

Custom-made or OEM is acceptable


Product Detail

Product Tags

What are the advantages of front idler production process

Quality professional services in mining and construction operations, with industry-leading warranty period of 6 months to 2 years and perfect after-sales service system. Regular production technology advantages are as follows:

The wheel body of our product is made of 35SiMn with a hardness of HRC55-58 and the deepth reach 6-8mm , which is more wear-resistant. Central shaft material for 42Crmo steel is not easy to fracture. So that the service life of the product is longer.

Our technology uses forging and precision casting, CNC vertical machining production.

Precision casting makes the wheel body of high density, no pores and not easy to leak gas.

CNC vertical machine is used for more accurate control of product size and higher finish smoothness. And the equipment is better, the operation is safe, the production efficiency is higher,

The technical drawing of the product is 1:1 original size. This will not appear when the customer purchase size deviation can not be installed.

We have a professional QC team, and to follow up the product testing, semi-finished and finished product testing and produce reports.

All products have their own ID number. When customers feedback product problems, we will find the corresponding QC test declaration according to the ID number of the product, find the problem and come up with the solution

Detail information

Description:

Front Idler Assembly Heavy duty Equipment

Place of origin:

China

Brand name:

PT'ZM

Brand name:

Hitachi

Model number

EX300-5

Part number

9154690

Price:

Negotiate

Packaging details:

Fumigate seaworthy packing

Delivery time:

7-30 days

Payment term:

L/C T/T

Price term:

FOB/ CIF/ CFR

Minimum order quantity:

1 PC

Supply Ability:

10000 pcs/month

Material:

35Simn/42Crmo/QT450-10

Technique:

Forging/Precision casting

Finish:

Smooth

Hardness:

HRC55-58, deepth 6-8mm

Quality:

mining operation heavy duty high-end quality

Warranty time:

24 monthes

After-sales service:

Video technical support,Online support

Color:

Black or Yellow or Customer required

Application:

Crawler excavator

Main technical parameter for Hitachi EX300-5 idler

Model

A

B

C

D

E

F

G

EX300-5

375

324

262

106

98

204

605

H

I

J

K

L

560

118

130

70

4-M16

EX300-5 DRAWING IDLER
EX300-5 IDLER DRAWING

Factory raw material

  • bottom roller material
  • bulldzoer idler material factories_
  • excavator  front idler manufacturers
  • suport roller ass
  • track link pin
  • track roller  material
  • front idler pin
  • track roller material
  • undercarriag parts idler  material

Factory workshop detail

  • undercarriage parts printing
  • track roller  test machine
  • track roller  machine
  • Track link chain machine
  • sprocket  machine
  • excavator undercarriage parts casting factories
  • excavator track link warehouse _
  • bulldozer undercarriage parts forge factories
  • bulldozer bottom roller warehouse

Packing method and shipping container details

  • dozer track roller packing method
  • bulldozer track roller  load in ship container
  • carrier roller loading in container
  • bulldozer track chain packing method
  • container load finish
  • excavator track link packing method
  • front idler  packing method
  • loading idler in container
  • top roller  packing method

  • Previous:
  • Next:

  • Write your message here and send it to us