Komatsu PC2000 Front Idler Assembly 21T-30-00381

Short Description:

Place of origin:China

Brand name:PT’ZM

Brand name:Komatsu

Model number:PC2000-8

Parts number:21T-30-00381

Minimum order quantity: 1 PC

Supply Ability:20 pcs /month

Price: Negotiate

Delivery time: 7-30 days

Payment term: L/C T/T

Price term: FOB/ CIF/ CFR

Application:  Excavator

Custom-made or OEM is acceptable


Product Detail

Product Tags

What are the advantages and functions of PC2000-8 idler manufactured by Pingtai

PC2000-8  series undercarriage parts of Komatsu mining excavators 200 ton  manufactured by PINGTAI is an excellent OEM and aftermarket serve your excavator.When high quality is a requirement and cost reduction is necessary, our products with industry-leading warranties of 6 months to 2 years are your solution. The function of and idler is to guide the track links into running smoothly and to prevent dislocation.Idlers also carry some weight and therefore increasing ther track links decreasing ground pressure.There is also an arm in the center which supports the track link and guides the two sides. The smaller the distance between the idler and track roller, the better the orientation. The more advantages of PC2000-8 idler as following:

The wheel body of PC2000-8 ilder is made of 35SiMn with a hardness of HRC55-58 and the deepth reach 6-8mm , which is more wear-resistant. Central shaft material for 42Crmo steel is not easy to fracture. So that the service life of the product is longer.

Our technology uses forging and precision casting, CNC vertical machining production. Precision casting makes the wheel body of high density, no pores and not easy to leak gas.  CNC vertical machine is used for more accurate control of product size and higher finish smoothness. And the equipment is better, the operation is safe, the production efficiency is higher,

The technical drawing of the product is 1:1 original size. This will not appear when the customer purchase size deviation can not be installed.

We have a professional QC team, and to follow up the product testing, semi-finished and finished product testing and produce reports. All products have their own ID number. When customers feedback product problems, we will find the corresponding QC test declaration according to the ID number of the product, find the problem and come up with the solution

 

 

Detail information of PC2000-8 idler

Description:

PC2000-8 Front Idler Assembly Mining Equipment

Place of origin:

China

Brand name:

PT'ZM

Brand name:

komatsu

Model number

PC2000-8

Part number

21T-30-00381

Price:

Negotiate

Packaging details:

Fumigate seaworthy packing

Delivery time:

7-30 days

Payment term:

L/C T/T

Price term:

FOB/ CIF/ CFR

Minimum order quantity:

1 PC

Supply Ability:

20 Sets/month

Material:

35Simn/42Crmo/QT500-10

Technique:

Forging/Precision casting

Finish:

Smooth

Hardness:

HRC55-58, deepth 6-8mm

Quality:

mining operation heavy duty high-end quality

Warranty time:

24 monthes

After-sales service:

Video technical support,Online support

Color:

Black or Yellow or Customer required

Application:

Crawler excavator

Main technical parameter for Komatsu PC2000-8 idler

PC2000-8

A

D

F

G

N

M

1073

311

480

630

560

145

PC2000-8 idler GRP

Factory raw material

  • bottom roller material
  • bulldzoer idler material factories_
  • excavator  front idler manufacturers
  • suport roller ass
  • track link pin
  • track roller  material
  • front idler pin
  • track roller material
  • undercarriag parts idler  material

Factory workshop detail

  • undercarriage parts printing
  • track roller  test machine
  • track roller  machine
  • Track link chain machine
  • sprocket  machine
  • excavator undercarriage parts casting factories
  • excavator track link warehouse _
  • bulldozer undercarriage parts forge factories
  • bulldozer bottom roller warehouse

Packing method and shipping container details

  • dozer track roller packing method
  • bulldozer track roller  load in ship container
  • carrier roller loading in container
  • bulldozer track chain packing method
  • container load finish
  • excavator track link packing method
  • front idler  packing method
  • loading idler in container
  • top roller  packing method

  • Previous:
  • Next:

  • Write your message here and send it to us