New Arrival China China Caterpillar Bulldozer D6r/D6h/D6t Undercarriage Sprocket Segments

Short Description:

Place of origin:China

Brand name:PT’ZM

Minimum order quantity: 1 PC

Supply Ability: 10000 PCS/month

Price: Negotiate

Delivery time: 7-30 days

Payment term: L/C T/T

Price term: FOB/ CIF/ CFR

Application: Bulldozer & Crawler excavator

 

 

 

 


  • :
  • Product Detail

    Product Tags

    Our products are widely recognized and trusted by users and can meet continuously changing economic and social needs for New Arrival China China Caterpillar Bulldozer D6r/D6h/D6t Undercarriage Sprocket Segments, The principle of our organization is usually to provide high-quality items, qualified services, and trustworthy communication. Welcome all friends to place trial order for developing a long-term small business relationship.
    Our products are widely recognized and trusted by users and can meet continuously changing economic and social needs for Bulldozer Segment, China Sprocket Segment, They are sturdy modeling and promoting effectively all over the world. Never ever disappearing major functions within a quick time, it’s a have to in your case of fantastic good quality. Guided by the principle of “Prudence, Efficiency, Union and Innovation. the corporation. ake an excellent efforts to expand its international trade, raise its organization. rofit and raise its export scale. We are confident that we’re gonna have a bright prospect and to be distributed all over the world in the years to come.
    The driving wheel is composed of a walking motor, a walking deceleration mechanism and a sprocket . The hydraulic pressure from the autonomous pump can be rotated by the walking motor and decelerated by the walking deceleration mechanism.. Then the crawler chain with teeth or gears that engages with a chain, track, or other perforated or dented material. The sprocket is located at the front and rear of the vehicle to drive the rails.
    Production process through professional quenching and tempering process, to ensure excellent mechanical properties, high strength and superior bending resistance, resistance to fracture and wear properties.
    * Adopt advanced machining center and vertical CNC lathe to meet the precision requirements.
    * Strict quality control, from raw materials to packaging.
    * Surface hardness HRC50-60, reduces wear and tear, extends service life, and further adds value to your products by maximizing product durability. rail is driven by the sprocket installed on the shell to realize the excavator’s walking. A chain hub sprocket is a special-shaped wheel

    Driving wheel: The driving wheel is located at the rear of X frame. The driving wheel is composed of a walking motor, a walking deceleration mechanism and a Chain hub sprocket .The hydraulic pressure from the autonomous pump can be rotated by the walking motor, which is decelerated by the walking deceleration mechanism. Then, the walking gear ring installed on the shell drives the track and chain rail to realize the walking of the excavator.
    Driving wheel: The driving wheel is located at the rear of X frame. The driving wheel is composed of a walking motor, a walking deceleration mechanism and a Chain hub sprocket .The hydraulic pressure from the autonomous pump can be rotated by the walking motor, which is decelerated by the walking deceleration mechanism. Then, the walking gear ring installed on the shell drives the track and chain rail to realize the walking of the excavator.
    One side of the driving wheel must always be in the rear, because it is directly fixed on the X frame without shock absorption function. If the driving wheel moves in the front, it will not only have abnormal wear on the driving ring gear and chain rail, but also have adverse effects on the X frame, which may have early cracking and other problems. Walking motor protector to protect the motor and its internal space can store some dirt and gravel, it will be harmful to walking motor oil pipeline, the moisture in the soil will corrosion of tubing, joint gravel will be involved in the interference caused by tubing wear leak, so regularly open the guard plate clean the dirt from the inside. When replacing the final transmission oil, the excavator should be parked on the flat ground, and the final transmission should be turned to the oil discharge port at the bottom and perpendicular to the ground. When refueling, tighten the oil discharge screw plug, refuel from the top of the refueling port, and the oil can flow out of the middle observation port.

    Drawing for chain hub sprocket

    Description: Chain hub sprocket forging / casting heavy duty
    Place of origin: China
    Brand name: PT’ZM
    Model number
    Brand:
    Price: Negotiate
    Packaging details: Fumigate seaworthy packing
    Delivery time: 7-30 days
    Payment term: L/C T/T
    Price term: FOB/ CIF/ CFR
    Minimum order quantity: 1 PC
    Supply Ability: 10000 PCS/month
    Material: ZG35SiMn
    Technique: Casting/Forging
    Finish: Smooth
    Hardness: HRC50-52
    Quality: heavy duty mining operation
    Warranty time: 1600hours
    After-sales service: Video technical support,Online support
    Color: Yellow or Black or Customer required
    Application: Bulldozer & Crawler excavator

    Our products are widely recognized and trusted by users and can meet continuously changing economic and social needs for New Arrival China China Caterpillar Bulldozer D6r/D6h/D6t Undercarriage Sprocket Segments, The principle of our organization is usually to provide high-quality items, qualified services, and trustworthy communication. Welcome all friends to place trial order for developing a long-term small business relationship.
    New Arrival China China Sprocket Segment, Bulldozer Segment, They are sturdy modeling and promoting effectively all over the world. Never ever disappearing major functions within a quick time, it’s a have to in your case of fantastic good quality. Guided by the principle of “Prudence, Efficiency, Union and Innovation. the corporation. ake an excellent efforts to expand its international trade, raise its organization. rofit and raise its export scale. We are confident that we’re gonna have a bright prospect and to be distributed all over the world in the years to come.

    Factory raw material

    • bottom roller material
    • bulldzoer idler material factories_
    • excavator  front idler manufacturers
    • suport roller ass
    • track link pin
    • track roller  material
    • front idler pin
    • track roller material
    • undercarriag parts idler  material

    Factory workshop detail

    • undercarriage parts printing
    • track roller  test machine
    • track roller  machine
    • Track link chain machine
    • sprocket  machine
    • excavator undercarriage parts casting factories
    • excavator track link warehouse _
    • bulldozer undercarriage parts forge factories
    • bulldozer bottom roller warehouse

    Packing method and shipping container details

    • dozer track roller packing method
    • bulldozer track roller  load in ship container
    • carrier roller loading in container
    • bulldozer track chain packing method
    • container load finish
    • excavator track link packing method
    • front idler  packing method
    • loading idler in container
    • top roller  packing method

  • Previous:
  • Next:

  • Write your message here and send it to us