Reasonable price China Excavator Spare Parts Bucket H Link for Zx350

Short Description:

Place of origin:China

Brand name:PT’ZM

Minimum order quantity: 1 PC

Supply Ability:10000 PCS/month

Price: Negotiate

Delivery time: 7-30 days

Payment term: L/C T/T

Price term: FOB/ CIF/ CFR

Application: Bulldozer & Crawler excavator

Custom-made or OEM is acceptable


Product Detail

Product Tags

It is our responsibility to meet your needs and efficiently serve you. Your satisfaction is our best reward. We are looking forward to your visit for joint growth for Reasonable price China Excavator Spare Parts Bucket H Link for Zx350, On account of superior top quality and aggressive selling price , we’ll be the market leader, be sure to don’t wait to get in touch with us by phone or email, should you be intrigued in almost any of our products.
It is our responsibility to meet your needs and efficiently serve you. Your satisfaction is our best reward. We are looking forward to your visit for joint growth for China Bucket Link, Excavator Link, “Good quality, Good service ” is always our tenet and credo. We take every effort to control the quality, package, labels etc and our QC will check every detail during producing and before shipment. We have been willing to establish long business relationship with those who seek the high quality solutions and good service. We now have set up a wide sales network across European countries, North of America, South of America, Middle East, Africa, East Asia countries.Remember to contact us now, you will find our expert experience and high quality grades will contribute to your business.

1.Excavator’s on BUCKET H-LINK structure, through the screw thread cooperate with seamless pipe connection, pin on seamless tube inserted in the interior of the bolt hole, to strengthen the structure of mild, set up the spring, absorb shock and earthquake, the purpose of art is to solve the current BUCKET H-LINK strength is not enough, easy to damage, increase the number of excavator maintenance and the maintenance cost and delay the progress of the excavator’s normal use.
2.The two ends of the H-link bucket are respectively formed with the front and rear sleeve of the outer surface of the arc matching, h-link bucket and the front and back end of the sleeve welding combination, BUCKET H-LINK using forging can greatly increase the BUCKET H-LINK strength, arc joint surface can improve the force surface of BUCKET H-LINK and sleeve, and increase the combination strength of BUCKET H-LINK and sleeve, the support is arranged between the two connecting arms can further improve the overall strength of the frame.
3.By setting a chip groove, chip hole and sealing rubber block, easy to discharge the particles generated by friction on the inner ear, avoid the particles generated by friction on the inner wall of the ear is not easy to discharge, resulting in increased friction degree, improve the strength of the connecting rib plate, avoid bending damage after the connecting rib plate stress.

The utility model qiqiuchi frame is bonded by a movable joint and a connecting pipe socket, so that the direction of the joint can be flexibly adjusted. The movable joint can be properly rotated to different angles according to the installation needs, and the appropriate length of the connecting pipe can be selected according to the needs. It is not limited by the site, and the installation is convenient.When the customer needs, according to the user needs to cut the length of the connection pipe socket bonding.

Description: Bucket H-LINK
Place of origin: China
Brand name: PT’ZM
Model number

Price: Negotiate
Packaging details: Fumigate seaworthy packing
Delivery time: 7-30 days
Payment term: L/C T/T
Price term: FOB/ CIF/ CFR
Minimum order quantity: 1 PC
Supply Ability: 10000 PCS/month

Material: Q345
Technique: Forging
Finish: Smooth
Hardness: HRC55-68

Quality: mining operation heavy duty high-end quality
Warranty time: 24 monthes
After-sales service: Video technical support,Online support
Color: Black or Yellow or Customer required
Application: Bulldozer & Crawler excavator

It is our responsibility to meet your needs and efficiently serve you. Your satisfaction is our best reward. We are looking forward to your visit for joint growth for Reasonable price China Excavator Spare Parts Bucket H Link for Zx350, On account of superior top quality and aggressive selling price , we’ll be the market leader, be sure to don’t wait to get in touch with us by phone or email, should you be intrigued in almost any of our products.
Reasonable price China Bucket Link, Excavator Link, “Good quality, Good service ” is always our tenet and credo. We take every effort to control the quality, package, labels etc and our QC will check every detail during producing and before shipment. We have been willing to establish long business relationship with those who seek the high quality solutions and good service. We now have set up a wide sales network across European countries, North of America, South of America, Middle East, Africa, East Asia countries.Remember to contact us now, you will find our expert experience and high quality grades will contribute to your business.

Factory raw material

  • bottom roller material
  • bulldzoer idler material factories_
  • excavator  front idler manufacturers
  • suport roller ass
  • track link pin
  • track roller  material
  • front idler pin
  • track roller material
  • undercarriag parts idler  material

Factory workshop detail

  • undercarriage parts printing
  • track roller  test machine
  • track roller  machine
  • Track link chain machine
  • sprocket  machine
  • excavator undercarriage parts casting factories
  • excavator track link warehouse _
  • bulldozer undercarriage parts forge factories
  • bulldozer bottom roller warehouse

Packing method and shipping container details

  • dozer track roller packing method
  • bulldozer track roller  load in ship container
  • carrier roller loading in container
  • bulldozer track chain packing method
  • container load finish
  • excavator track link packing method
  • front idler  packing method
  • loading idler in container
  • top roller  packing method

  • Previous:
  • Next:

  • Write your message here and send it to us