Short Lead Time for Track Roller Wheels - Chain Hub Sprocket – Pingtai

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our solutions are broadly acknowledged and dependable by users and may meet consistently developing economic and social requires for Kingmet Bucket Teeth, Bulldozer Part, Screw, As an experienced group we also accept custom-made orders. The main intention of our firm is to build up a satisfying memory for all consumers, and set up a long-term win-win small business connection.
Short Lead Time for Track Roller Wheels - Chain Hub Sprocket – Pingtai Detail:

The driving wheel is composed of a walking motor, a walking deceleration mechanism and a sprocket . The hydraulic pressure from the autonomous pump can be rotated by the walking motor and decelerated by the walking deceleration mechanism.. Then the crawler chain with teeth or gears that engages with a chain, track, or other perforated or dented material. The sprocket is located at the front and rear of the vehicle to drive the rails.
Production process through professional quenching and tempering process, to ensure excellent mechanical properties, high strength and superior bending resistance, resistance to fracture and wear properties.
* Adopt advanced machining center and vertical CNC lathe to meet the precision requirements.
* Strict quality control, from raw materials to packaging.
* Surface hardness HRC50-60, reduces wear and tear, extends service life, and further adds value to your products by maximizing product durability. rail is driven by the sprocket installed on the shell to realize the excavator’s walking. A chain hub sprocket is a special-shaped wheel

Driving wheel: The driving wheel is located at the rear of X frame. The driving wheel is composed of a walking motor, a walking deceleration mechanism and a Chain hub sprocket .The hydraulic pressure from the autonomous pump can be rotated by the walking motor, which is decelerated by the walking deceleration mechanism. Then, the walking gear ring installed on the shell drives the track and chain rail to realize the walking of the excavator.
Driving wheel: The driving wheel is located at the rear of X frame. The driving wheel is composed of a walking motor, a walking deceleration mechanism and a Chain hub sprocket .The hydraulic pressure from the autonomous pump can be rotated by the walking motor, which is decelerated by the walking deceleration mechanism. Then, the walking gear ring installed on the shell drives the track and chain rail to realize the walking of the excavator.
One side of the driving wheel must always be in the rear, because it is directly fixed on the X frame without shock absorption function. If the driving wheel moves in the front, it will not only have abnormal wear on the driving ring gear and chain rail, but also have adverse effects on the X frame, which may have early cracking and other problems. Walking motor protector to protect the motor and its internal space can store some dirt and gravel, it will be harmful to walking motor oil pipeline, the moisture in the soil will corrosion of tubing, joint gravel will be involved in the interference caused by tubing wear leak, so regularly open the guard plate clean the dirt from the inside. When replacing the final transmission oil, the excavator should be parked on the flat ground, and the final transmission should be turned to the oil discharge port at the bottom and perpendicular to the ground. When refueling, tighten the oil discharge screw plug, refuel from the top of the refueling port, and the oil can flow out of the middle observation port.

Drawing for chain hub sprocket

Description: Chain hub sprocket forging / casting heavy duty
Place of origin: China
Brand name: PT’ZM
Model number
Brand:
Price: Negotiate
Packaging details: Fumigate seaworthy packing
Delivery time: 7-30 days
Payment term: L/C T/T
Price term: FOB/ CIF/ CFR
Minimum order quantity: 1 PC
Supply Ability: 10000 PCS/month
Material: ZG35SiMn
Technique: Casting/Forging
Finish: Smooth
Hardness: HRC50-52
Quality: heavy duty mining operation
Warranty time: 1600hours
After-sales service: Video technical support,Online support
Color: Yellow or Black or Customer required
Application: Bulldozer & Crawler excavator

Product detail pictures:

Short Lead Time for Track Roller Wheels - Chain Hub Sprocket – Pingtai detail pictures

Short Lead Time for Track Roller Wheels - Chain Hub Sprocket – Pingtai detail pictures

Short Lead Time for Track Roller Wheels - Chain Hub Sprocket – Pingtai detail pictures

Short Lead Time for Track Roller Wheels - Chain Hub Sprocket – Pingtai detail pictures

Short Lead Time for Track Roller Wheels - Chain Hub Sprocket – Pingtai detail pictures


Related Product Guide:

Our aim is usually to give superior quality items at aggressive rates, and top-notch company to clients around the earth. We have been ISO9001, CE, and GS certified and strictly adhere to their good quality specifications for Short Lead Time for Track Roller Wheels - Chain Hub Sprocket – Pingtai , The product will supply to all over the world, such as: California, California, Sudan, With the development and enlargement of mass clients abroad, now we've set up cooperative relationships with many major brands. We've our own factory and also have many reliable and well-cooperated factories in the field. Adhering to the "quality first, customer first, We are provideing high-quality, low-cost items and first-class service to customers. We sincerely hope to establish business relationship with customers from all over the world on the basis of quality, mutually benefit. We welcome OEM projects and designs.
  • Problems can be quickly and effectively resolved, it is worth to be trust and working together.
    5 Stars By Ivan from Venezuela - 2018.04.25 16:46
    The goods we received and the sample sales staff display to us have the same quality, it is really a creditable manufacturer.
    5 Stars By Frederica from Puerto Rico - 2018.11.04 10:32
    Write your message here and send it to us