Wholesale OEM/ODM China Bulldozer Track Group D475 D475A Komatsu Track Link with Shoes Track Chain Assembly

Short Description:

Place of origin:China

Brand name:PT’ZM

Brand name:Komatsu

Model number:D475

Parts number:198-30-00810

Parts number:198-30-00410

Minimum order quantity: 1 PC

Supply Ability:10000 pcs /month

Price: Negotiate

Delivery time: 7-30 days

Payment term: L/C T/T

Price term: FOB/ CIF/ CFR

Application:  Bulldozer

Custom-made or OEM is acceptable


Product Detail

Product Tags

Our company promises all users of the first-class products and the most satisfying post-sale service. We warmly welcome our regular and new customers to join us for Wholesale OEM/ODM China Bulldozer Track Group D475 D475A Komatsu Track Link with Shoes Track Chain Assembly, Encouraged via the fast producing marketplace of your rapidly food stuff and beverage consumables all around the entire world , We have been seeking forward to doing work with partners/clients to help make achievements with each other.
Our company promises all users of the first-class products and the most satisfying post-sale service. We warmly welcome our regular and new customers to join us for China Trak Link, Track Chain, Our faith is to be honest first, so we just supply high quality products to our customers. Really hope that we can be business partners. We believe that we can establish long time business relationship with each other. You can contact us freely for more information and pricelist of our solutions !

PINGTAI manufacturers provide D475 series landing gear components specifically designed to provide extended life and durability under the toughest operating conditions. Excellent after-sales service, warranty 6 months to 2 years.

The function of D475 carrier rollers is to carry the track link upwards, make certain things are linked tightly, and enable the machine to work faster and more steadily . Our products use special steel and produced by new process. Every procedure goes through strict inspection and the property of compressive resistance and tension resistance can be ensured.

The material of the carrier roller body is forged by 40Mn2. and the surface heat treatment HRC 48-55 depth up to 5-8mm. Precision CNC machine machining size is more accurate

The center shaft of the carrier roller material is 42CrMo and forged .The hardness of surface heat treatment can reach 48-55HRC More wear-resisting . Core hardness of HRC 28 or above is not easy to fracture. Tempering 180 degrees before finishing. The surface of the center shaft of the carrier roller is polished by CNC machine tool to make the shaft smoother.

High sealing aprons are used inside the carrier roller to prevent dirt, sand and water from damaging it.

The carrier roller using friction welding technology welding quality is good and stable, and environmental protection, no pollution. Welding process does not produce smoke or harmful gas, no splash, no lone light and spark, no radiation. Known as the green welding technology of the future.

 

Description:

Carrier Roller OEM Manufacturer Heavy duty

Place of origin:

China

Brand name:

PT’ZM

Brand name:

Komatsu

Model number

D475

Part number

198-30-00810

Part number

198-30-00410

Price:

Negotiate

Packaging details:

Fumigate seaworthy packing

Delivery time:

7-30 days

Payment term:

L/C T/T

Price term:

FOB/ CIF/ CFR

Minimum order quantity:

1 PC

Supply Ability:

10000 PCS/month

Material:

40Mn2/42Crmo

Technique:

Forging

Finish:

Smooth

Hardness:

HRC55-58, deepth 6-8mm

Quality:

mining operation heavy duty high-end quality

Warranty time:

24 months

After-sales service:

Video technical support,Online support

Color:

Black or Yellow or Customer required

Application:

Crawler Bulldozer

 

D475

A

B

C

D

E

F

G

H

552

188

177

326

155

275

240

90

D475 CARRIER ROLLER DRAWING

D475A-1, D475A-2, D475A-3, D475A-5

Komatsu D475 heavy crawler bulldozer is suitable for comparison mines where strong operations are required.The machine is EPA Class 2 certified and can produce up to 664kW and 890HP.Hydraulic torque converters help save fuel, and the cab’s top features will make your crew look forward to operating this bulldozer every day. bulldozer due to long time running walking and large volume caused by undercarriage overload wear, regular undercarriage parts maintenance for heavy crawler bulldozer is very important, select high-end quality qualified undercarriage please contact us to ensure that your Komatsu D475 bulldozer better service for you.

Our company promises all users of the first-class products and the most satisfying post-sale service. We warmly welcome our regular and new customers to join us for Wholesale OEM/ODM China Bulldozer Track Group D475 D475A Komatsu Track Link with Shoes Track Chain Assembly, Encouraged via the fast producing marketplace of your rapidly food stuff and beverage consumables all around the entire world , We have been seeking forward to doing work with partners/clients to help make achievements with each other.
Wholesale OEM/ODM China Trak Link, Track Chain, Our faith is to be honest first, so we just supply high quality products to our customers. Really hope that we can be business partners. We believe that we can establish long time business relationship with each other. You can contact us freely for more information and pricelist of our solutions !

Factory raw material

  • bottom roller material
  • bulldzoer idler material factories_
  • excavator  front idler manufacturers
  • suport roller ass
  • track link pin
  • track roller  material
  • front idler pin
  • track roller material
  • undercarriag parts idler  material

Factory workshop detail

  • undercarriage parts printing
  • track roller  test machine
  • track roller  machine
  • Track link chain machine
  • sprocket  machine
  • excavator undercarriage parts casting factories
  • excavator track link warehouse _
  • bulldozer undercarriage parts forge factories
  • bulldozer bottom roller warehouse

Packing method and shipping container details

  • dozer track roller packing method
  • bulldozer track roller  load in ship container
  • carrier roller loading in container
  • bulldozer track chain packing method
  • container load finish
  • excavator track link packing method
  • front idler  packing method
  • loading idler in container
  • top roller  packing method

  • Previous:
  • Next:

  • Write your message here and send it to us